Fly Fishing Forums
Go Back   Fly Fishing Forums > Casting Talk and Fishing Knots > Casting
Forums Register Blogs FAQ Members List Social Groups Calendar Search Today's Posts Mark Forums Read

Reply
 
Share LinkBack Thread Tools Display Modes
  #1 (permalink)  
Old 14-09-2010, 07:18 PM
macman's Avatar
Member
 
Join Date: Aug 2009
Posts: 13
macman is on a distinguished road
Default problems casting a long leader 15 to 20 ft

Hi I can cast a leader of about 10ft without any tangles but a soon as extended more than 10ft I get tangles. I'm using a sonik sk4 aftm7/8 aftm thinking of changing to Greys Xflite or GRXI AFTM6 hoping this might help
Reply With Quote
  #2 (permalink)  
Old 14-09-2010, 07:49 PM
Darren Lewis's Avatar
Trade Member
 
Join Date: Apr 2008
Location: Hampshire
Posts: 2,622
Darren Lewis is on a distinguished road
Default

Could be lots of reasons, the rod may be the last thing to look at.

1. Is the fly too wind resistant for the leader so the leaders failing to turn it over.

2. Is the leader really limp not transferring the power very well?

3. More likely, is your stop on your forward cast not strong enough leading to a lacklustre forward delivery that's not transmitting the full amount of energy to the loop?

4. Are your loops too big so the air resistence is killing your leader at the last gasp?

5. Are you casting at the water so the leader never gets a chance to turn over?

There are several other little things, but it's probably 3 or 4 I suspect.
Reply With Quote
Reply





Thread Tools
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are On
Pingbacks are On
Refbacks are On


Similar Threads
Thread Thread Starter Forum Replies Last Post
Casting problems, or line selections? BlennyBoy Tackle Talk 4 24-01-2010 07:51 PM
Lefty Kreh - Solving casting problems spidersplus Other Fishing Equipment/Clothing/Books/DVD's etc. 2 15-04-2009 01:14 PM
Tippet/leader material problems.....help!! paulfish_1 Tackle Talk 4 01-11-2007 05:34 PM
Casting problems andygrey Fly fishing for other species 3 05-01-2007 09:05 AM
Casting Problems EF DUCK Casting 2 06-07-2006 11:43 AM






All times are GMT. The time now is 10:16 PM.


Loading...
Powered by vBulletin® Version 3.8.5
Copyright ©2000 - 2012, Jelsoft Enterprises Ltd.
Content Relevant URLs by vBSEO 3.6.0
2006-2011 Fish&Fly Ltd